Multi-tenant Office building in Cupertino
We evaluated existing conditions and complaints of excessive energy costs and lack of consistent temperatures and comfort. We engineered a major renovation project, replaced the existing HVAC equipment and installed an Energy Management System. The result was complete satisfaction in comfort and energy savings to the extent that the entire system was paid for from energy savings within 2 years.

Multi-tenant Office Building in Los Altos
We installed an Energy Management, Telephone Override, and paging alarm systems on to the existing HVAC equipment. The results were tremendous energy savings, individual tenant control, and alarm indication when problems arise. We have been able to alert the owner of problems and system failures before they became aware of it. We monitor excessive use of the HVAC equipment and report to the owner for extra excess usage charges.



Camera Theaters in San Jose and Campbell
We utilized a helicopter crane to install new HVAC equipment in hard to reach places at Camera 7. We were hired directly by the owners to renovate the new Camera 12 theater in downtown San Jose, where we provided remote building automation systems for assured comfort for the elite movie-going public.

New Multi-tenant Office Building in Morgan Hill

We installed all the HVAC equipment on the roof and designed a versatile Multi-Zone Control System in conjunction with a Building Energy Management system. This provided flexibility to condition areas as new tenants begin to occupy various parts of the building. Each tenant has individual control regardless of which units are used. Tenants’ zones are programmed with time and temperature limits, and override use is metered and reported to the owner for excess usage charges.

Old Memorex Plant in Santa Clara
We engineered and implemented the transformation of this facility (campus) to R & D and office use. The work included the installation of many HVAC systems, as well as digital multi-zone controls and a Clean Room Chiller. All the work was done within budget and time limits.